TACKLE THOSE GRADES!
     Often our garden railroad tracks have to climb up and down hills, just like the real railroads.  This can make
for some real challenges.  How steep can it be?  How does this affect the trains?  First we'll take a look at how
the real railroads deal with these challenges and then how we deal with them in our garden railroads.

      Many railroads had mountains to cross and had to choose whether to go around the mountains, up and
over, or some combination in between.  An example of going around is the New York Central's route from
New York to Chicago - the "Water Level Route" - that avoided the Allegheny Mountains by going north to
Albany, then west. The Pennsylvania Railroad went up and over the mountains, building the famous Horseshoe
Curve to route trains up to the summit.  The New York Central had more miles but the Pennsy had to deal with
the grades.

CALCULATING GRADIENT

      In the U.S., grades are described in "Percent Gradient," meaning how many feet rise in elevation per 100
feet of track.  A level track is zero percent; a one foot rise per 100 feet is a one percent grade; a two foot rise
per 100 feet is a two percent grade, and so on.  In general, railroads keep their grades as low as possible to
keep operating expenses down.  Heavy grades take their toll on fuel, maintenance, number of locomotives,
helper crew costs, and slower schedules.  A long stretch of one percent is considered a heavy climb (the
Feather River Canyon for instance), but there are many places that grades are higher than this.

GRADES ON FAMOUS MOUNTAIN CROSSINGS

     The Pennsylvania Railroad tackled the Alleghenies between Altoona and Gallitzin by winding the railroad
around the hills and valleys to achieve more track length.  This kept the grade at a manageable 1.75 percent, but
it still requires helpers to this day.  The Baltimore and Ohio was not so fortunate.  Its "West End" route from
Cumberland MD to Grafton WV had FOUR long, winding grades of 2.2%.  The Rio Grande's main line across
Colorado had to tackle a big 3 percent grade up to Tennessee Pass.  But their narrow gauge routes were even
tougher: many mountains had to be crossed with 4% grades.  One of these 4% grades is tackled every day by
the Cumbres and Toltec Scenic Railroad.  The Southern Railway had a route (now closed) that climbed Saluda
Mountain at 4.7 percent.  The steepest mainline grade in the U.S. was the Madison Incline pulling out of the
Ohio River Valley at a whopping 5.89 percent grade.  The Cass Mountain Railroad had a maximum grade of
11% where Shays were used to pull empty log cars up the mountain and loaded ones down, and you can ride
the same route today.  There are a few cases of railroad grades even steeper with the help of geared rails (cog
railroads) or cables (often called planes).  The Mount Washington Cog Railroad has a maximum grade of
37.5% and still uses steam engines.  The Mahanoy Plane of the Reading had a 22% grade and pulled one or
two cars at a time up or down the hill.  It was eliminated in the 1930's when the railroad built a long tunnel
instead.
HOW RAILROADS DEAL WITH GRADES

1.  More horsepower - trains are dispatched with more horsepower per ton of train.  Big modern engines are
now producing 4400 horsepower each, often running in sets of two or three.  In the steam era, railroads built
extremely powerful locomotives for tackling the mountains, with as many drivers as possible.  Many used
articulated engines, which used two sets of drivers, one able to hinge on curves.  (A Mallet is an articulated
locomotive that uses steam twice, so the front cylinders are extremely large. It's also relatively slow.)  Once the
trains were up and over the mountains, they could be reassembled into longer trains with faster engines.

2.  Helper service - Freight trains get helper engines in the rear of the train (pushers) or sometimes in the middle
of the train (swing helpers).  Nowadays on heavy freight trains, helpers are often used downhill as well as uphill
because the extra engines provide more dynamic braking, which is safer and more economical than relying on
train brakes.  Passenger trains and intermodal trains often do without hepers, but when they have one it's usually
an extra engine in the front.  Railroads dislike the expense of helpers, so many helper districts have been
eliminated.  But several will be around awhile: Horseshoe Curve (PA); Sandpatch Grade (PA), Donner,
Tehachapi, Cajon, and Dunsmuir (CA); Moffat Tunnel Route (CO), and Stevens Pass (WA).

3.  Doubling the hill - In remote areas, or where there aren't enough trains to justify a helper, train crews will
"double" the hill.  They split their train in two at the bottom of the hill, take half up the hill, leave it on a siding, go
back down the hill, pick up the other half, and reassemble the whole train at the top of the hill.

4.  Rebuilding the route - railroads try to reduce grade and curvature by building tunnels through the mountains
and crossing valleys with bridges, trestles, and fills.  Rio Grande's Moffat Tunnel is over six miles long and there
are several even longer.  A tunnel is now being built under the Swiss Alps that will be over 35 miles long!  
Southern Pacific avoided the original transcontinental route through the Promontory Mountains by building a long
trestle all the way across the Great Salt Lake. The Virginian had far fewer tough grades than the Norfolk and
Western because its route used many tall steel trestles to cross valleys.
GRADES ON GARDEN RAILROADS

    For garden railroads, grades are often necessary.  But there are cases where the builder has a choice.  Here is
what I would recommend:

1.  Flat or minimum grades for continuous running, such as Open Houses, modular displays, show layouts, etc. This
creates less wear and tear on locomotives, less current required from power packs, less drain on batteries, and is
easiest to run when you can't pay full attention to the railroad.  Also, for live steam railroads, flat trackage is very
important unless all the engines have remote control.

2.  Moderate grades on main lines for adding interest to the scenery, looping up and over, or building track without
too much extra shoveling and moving of dirt and rocks.  I would recommend no higher than 2 percent grade
whenever possible.

3.  Steeper grades for specific operations.  You may want to see how many cars your favorite engine can pull
before it starts to slip.  You can justify that Mallet or Dash 9 because you need the power to climb a grade.  Or you
may want to build a helper district where operators must use helper engines.  You may want to build a logging
operation that climbs a mountain and justifies that new Shay or Heisler.  In some cases, a garden railroad is built on
the side of a hill, which means steeper grades may be  necessary.
   Five percent is not unreasonable for smaller trains and straight track.  But if your trains are winding around
curves, it's best to keep the grades down to 3 % or less.

4.  Looping up-and-over: a five-foot radius loop would require  a steep 2.4% to loop over itself with a clearance of
9 inches. A ten-foot radius loop can climb 9 inches at a moderate 1.2% grade (for higher clearance, 12 inches, the
grade would be 1.6%).  With a ten-foot radius, a train 63 feet long would be able loop over itself.
Here on Bob Fletcher's railroad, the train has already looped over itself at about the
40th car.  A second train is next to this one on the other track, giving the illusion of a
much longer train.
MEASURING GRADES ON YOUR GARDEN RAILROAD

Here's a quick-and-easy method to measure grades.  Take a 24-inch level and a set of 1/4 inch shims of
wood.  Set the level on the track and raise the lower end with the shims until the bubble's in the center.  
One shim is 1%, two shims are 2%, and so on.

A more precise measurement can be done in a similar way but with a little bit of math.  This time take a
24-inch level and a ruler measured in millimeters.  Raise the lower part of the level until the bubble is in
the center, then measure how high the lower end was raised in millimeters. Every 6.1 mm is 1 percent.
   
                 The Math:  Percent Grade = millimeters on small ruler divided by 6.1
An RS3 pulls a cut of empty hoppers up to the mine on a 5
percent grade.
With the level's bubble centered, the track rises 18.3 mm.  So the grade here is
3.0 percent.