| NUMBER 6 TURNOUT CONSTRUCTION SPECS |
5/25/2010 | |||||||||||||
| Ties are cut from 2x6 treated lumber, rip cut once to make 1.5 x 2.5 inch pieces, mounted upright. Following data is for building a No. 6 turnout with rails 10 feet long, ties spaced every 4 inches. Measurements start at the point end of the turnout, with tie centerlines at 4 inches each. |
||||||||||||||
| Gauge between stock rails 7 9/16 7 9/16 7 9/16 7 7/8 8 1/4 8 7/16 8 11/16 8 13/16 9 1/4 9 1/2 9 7/8 10 1/4 11 1/16 12 13 3/16 14 7/16 |
||||||||||||||
| Tie No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 |
||||||||||||||
| Length(in) 13.5 13.5 13.5 24 24 16 16 16 16 16 16 16 18 18 18 18 18 20 20 20 20 22 22 22 24 24 24 26 26 |
Notes Points are on tie #4 Points pivot on tie #10 Frog joint is on tie #23 Frog point is 8 ft 2 in from end Other frog joint is on tie #26 |
|||||||||||||