LOGGING RAILROAD OPERATION
APRIL 18, 2015
It was a warm Saturday afternoon in mid April.  Paul and Amy, and their dog Goose, came over for a
visit and to help us remove logs from the back side of the railroad near the covered bridge.  Paul did
all the sawing, loading, and unloading, and I had the easy job of running the train. We ran 6 flatcar
loads, one car at a time, and had a great time. It's like a real, functioning logging railroad!
[next page]
[home]